ProjectBeverly Seniors Living
Address11515 36 Street Edmonton AB
Site SuperintendentSteve Taylor
General ContractorBIRD
102, 17007-107 Ave Edmonton Alberta T5S 1G3 CANADA
Comments

Erection of structural steel

Anvul Steel Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Site ContactSteve Taylor
CWB RepresentativeAlex Duarte
Date2026-07-30