ProjectPolykar Expansion
Project Number25-1-13
Address9406 130 Street SW Edmonton, Ab T6Y 0N3
Site SuperintendentMark Doornenbal
General ContractorDawson Wallace Construction Ltd
2-2315 30th Ave. N.E. Calgary AB T2E 7C7 Canada
Project EngineerIchiro Watanabe
10410 102 Ave #500 Edmonton Alberta T5J 0E9 Canada
Comments

Beams, columns

Spartan Steel Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Site ContactMark Doornenbal
CWB RepresentativeBonnie Sharratt
Date2026-07-06