ProjectDucting support frames
Address101-27353, 58 Cres, Langley, BC
Site SuperintendentRick Custeau
General ContractorFraser valley refrigeration
26121 Fraser Hwy Aldergrove BC V4W2T8 Canada
Comments

Ducting support frames

Preferred Steel Construction Inc. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Site ContactRick Custeau
CWB RepresentativeAdam Ferns
Date2026-06-29