Project555 MAPLETON RD
Address555 MAPLETON RD MONCTON, NB E1G 2K5
Site SuperintendentPAULA BOURQUE
General ContractorNEWCO CONSTRUCTION
50 Rooney Crescent MONCTON NB E1E 4M3 CANADA
Project EngineerJACK VANDERBROEK
855 Dieppe Blvd SUITE 3 DIEPPE NB E1A 7R8 Canada
Comments

STRUCTURAL STEEL MODIFICATIONS.
LINTELS, MISC METALS

Summit Steel Fabricators Inc. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Site ContactPAULA BOURQUE
CWB RepresentativeRon Stiles
Date2025-05-29