ProjectIndustrial building new.
Address344 WRIGHT BLVD STRATFORD
Site SuperintendentSTEVE HEITBEHMER
General ContractorFELTZ DESIGN BUILD
8 HAHN COURT STRATFORD ON N5A 6S4 CANADA
Comments

Erection of structural steel and field welding.

D & N Steel Limited is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Site ContactSTEVE HEITBEHMER
CWB RepresentativeSanel Hadziavdic
Date2025-05-30