ProjectWAMART RENOVATION
Address477 Paul St, Dieppe, NB E1A 4X5
Site SuperintendentSCOTT ALEXANDER
General ContractorCAMBRIA DESIGN BUILD
1250 JOURNEYS END CIRCLE UNIT#1 NEWMARKET ONTARIO L3Y 0B9 CANADA
Project EngineerADAM WOOD
520 Bingemans Centre Drive Kitchener ON N2B 3X9 Canada
Comments

STRUCTUAL STEEL FABRICATION.

Akal Steel (2005) Inc. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Site ContactSCOTT ALEXANDER
CWB RepresentativeRon Stiles
Date2025-06-18