ProjetRDRH Parkade Expansion
Adresse3942 50a Ave Red Deer Alberta
Surintendant du siteTravis Gebbink
Entrepreneur généralSHUNDA Consulting & Construction Management
6204-46 Avenue Red Deer AB T4N 7A2 Canada
Commentaires

Extension to parkade and supporting structural steel

Red Willow Welding 2012 Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteTravis Gebbink
Représentant de la CWBDustin Peitzsche
Date2025-02-07