ProjetNaache Commons Phase 1
Adresse10421 116 Street, Fort St. John, BC
Surintendant du siteDon Stanton
Entrepreneur généralPetrocom Construction LTD.
17505 109A Ave Edmonton Alberta T5S2W4 Canada
Commentaires

Erection of structural steel

Anvul Steel Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteDon Stanton
Représentant de la CWBBruce Cormier
Date2025-04-22