ProjetFoob Basics - Embrun
Adresse245 Village St. Embrun On
Surintendant du siteJoe Aguiar
Entrepreneur généralArsenal Constructors Inc.
151 Applewood Crescent unit 8 Vaughan On L4K 4E3 Canada
Commentaires

Certification status of fabrication company

Akal Steel (2005) Inc. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteJoe Aguiar
Représentant de la CWBCody Pelley
Date2025-05-20