Rapport d'information sur le site
Projet | Pattullo Bridge Replacement Project |
---|---|
Adresse | 12031 Musqueam Dr Surrey BC, Canada |
Surintendant du site | Paul Hopkins |
Entrepreneur général | Fraser Crossing Constructors General Partnership 1055 Dunsmuir Street, Suite 2124
Vancouver BC V7X 1J1
Canada |
Commentaires | Pre-fabricated steel bridge segments. China Railway Shanhaiguan Bridge Group Co. Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 1 and, therefore, does meet the requirements of CSA S6 “Canadian Highway Bridge Design Code” Clause A10.1.5.5. |
Contact sur le site | Paul Hopkins |
Représentant de la CWB | Sean Mulleady |
Date | 2025-07-04 |