ProjetHorton Bridge Steel Bracing repair
AdresseHorton Bridge (KIN105) Highway 101 Kings County Between Exit 9 and 10 Nova Scotia
Surintendant du sitePaul Ryan
Entrepreneur généralN.S. Department of Public Works Steel Bridge Western
445 Jubilee Road Hebbville NS B4V 6W9 Canada
Ingénieur de projetStacey Myatt
1505 Barrington Street Halifax NS B3J 3K5 Canada
Commentaires

Repair on cover plates on Steel bracings . older shorter plates a being removed and replaced with 4ft x3/8" plates being welded with 7018 electrodes . Joints consist of fillet welds and single v-groove welds with a backing. All welders working on this project are qualified with 4GF S-class SMAW , verified at time of visit . All weldments to be visually inspected by Paul Ryan and third party visual and MPI on all weldments

N.S. Department of Public Works Steel Bridge Western is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S6 “Canadian Highway Bridge Design Code” Clause A10.1.5.5.

CSA S6 Clause A10.1.5.5: “Fabricators and erectors responsible for welding structures fabricated or erected under this Code (including steel piles, railings and guards, or other welded attachments) shall meet the requirements of CSA W47.1 (Division 1 or Division 2).”

Contact sur le sitePaul Ryan
Représentant de la CWBScott Osmond
Date2025-09-02