Rapport d'information sur le site
Projet | Horton Bridge Steel Bracing repair |
---|---|
Adresse | Horton Bridge (KIN105) Highway 101 Kings County Between Exit 9 and 10 Nova Scotia |
Surintendant du site | Paul Ryan |
Entrepreneur général | N.S. Department of Public Works Steel Bridge Western 445 Jubilee Road
Hebbville NS B4V 6W9
Canada |
Ingénieur de projet | Stacey Myatt 1505 Barrington Street
Halifax NS B3J 3K5
Canada |
Commentaires | Repair on cover plates on Steel bracings . older shorter plates a being removed and replaced with 4ft x3/8" plates being welded with 7018 electrodes . Joints consist of fillet welds and single v-groove welds with a backing. All welders working on this project are qualified with 4GF S-class SMAW , verified at time of visit . All weldments to be visually inspected by Paul Ryan and third party visual and MPI on all weldments N.S. Department of Public Works Steel Bridge Western is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S6 “Canadian Highway Bridge Design Code” Clause A10.1.5.5. |
Contact sur le site | Paul Ryan |
Représentant de la CWB | Scott Osmond |
Date | 2025-09-02 |