ProjetAvenue Machinery
Numéro du projet2402
Adresse37461 North Parallel Road Abbotsford BC
Surintendant du siteDean Litvinsky
Entrepreneur généralTeck Constructiuon LLP
5197 216th St Langley BC V3A 2N4 Canada
Commentaires

Tilt up building.

Impact Ironworks Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteDean Litvinsky
Représentant de la CWBJamie Egmore
Date2025-04-10