ProjetWERKLIV
Numéro du projet23-103
Adresse6 LAMBE'S LANE ST.JOHN'S , NL A1B 4E9
Surintendant du siteJOHN MACDOUGALL
Entrepreneur généralGOODWORK
1470 PEEL ST. MONTREAL QUEBEC H3A 1T5 CANADA
Commentaires

Structural steel fabricator

MacDougall Steel Erectors Inc. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteJOHN MACDOUGALL
Représentant de la CWBJason Cluett
Date2024-07-21