ProjetPattullo Bridge Replacement Project
Adresse12009 Musqueam Dr Surrey, BC, Canada
Surintendant du siteFrank Dams
Entrepreneur généralFraser Crossing Constructors General Partnership (FCCGP)
Suite 310, 625 Agnes Street New Westminster BC V3M 5Y4 Canada
Commentaires

Welding of Piles

Fraser River Pile & Dredge (Gp) Inc. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S6 “Canadian Highway Bridge Design Code” Clause A10.1.5.5.

CSA S6 Clause A10.1.5.5: “Fabricators and erectors responsible for welding structures fabricated or erected under this Code (including steel piles, railings and guards, or other welded attachments) shall meet the requirements of CSA W47.1 (Division 1 or Division 2).”

Contact sur le siteFrank Dams
Représentant de la CWBSean Mulleady
Date2025-06-18