ProjetSherwood Power Sports & Marine
Adresse371 Lakeland Drive Sherwood Park
Surintendant du siteJames Hall
Entrepreneur généralLexon Projects
2327 91 Avenue NW Edmonton Alberta T6P 1L1 Canada
Ingénieur de projetBarry Lavioette
7609 115 St NW Edmonton AB T6G 1N4 Canada
Commentaires

Concrete Wall panels welded into place.

Alberta Precast Spruce Grove Alberta is not certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” and, therefore, does not meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.
NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall be certified by the Canadian Welding Bureau to the requirements of CSA W47.1 (Division 1 or Division 2), CSA W55.3, or both, as applicable. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteJames Hall
Représentant de la CWBDarrell Draves
Date2023-06-01