ProjetMichener Park
Numéro du projet24036
Adresse606F Michener Park NW Edmonton, AB
Surintendant du siteMatt Sinkiewicz
Entrepreneur généralSynergy Projects Ltd
120, 110 Carleton Drive St Albert Alberta T8N 3Y4 Canada
Commentaires

Erection of structural steel

Rampart Steel Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteMatt Sinkiewicz
Représentant de la CWBJill Coady
Date2025-04-29