ProjetHighland Park Fire Station and Training Centre
Adresse960 Hamilton Boulevard NE Airdrie
Surintendant du siteAlan Ross
Entrepreneur généralPCL Construction
340- 3030 2nd Avenue SE Calgary AB T2A 5N7 Canada
Commentaires

Installer of metal roof deck via welding.

Amac Contracting Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 3 and has been sublet the work by Metal-Fab Industries Ltd. who is certified in Division 2, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteAlan Ross
Représentant de la CWBAndrew Lucking
Date2025-11-19