ProjetParadigm Grand Towers-Phase 3
Numéro du projet21 027940 00M3
Adresse2095 Fairview St. Burlington
Surintendant du siteJason Park
Entrepreneur généralMolinaro Group
201-761 Brant Street Burlington Ontario L7R 2H7 Canada
Ingénieur de projetAndrew Bayne
144 Front Street Toronto Ontario M5J 2L7 Canada
Commentaires

Erection and installation of steel awnings over entrances

Lemire Mobile Welding & Fabrication Ltd. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 3 but was not sublet the work by a company certified to Division 1 or 2 and, therefore, does not meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteJason Park
Représentant de la CWBMatthew Keep
Date2026-05-20