ProjetDrake Meat Processors
Adresse71st east and Lipsett Cr, Saskatoon Sk.
Surintendant du siteChad Coakwell
Entrepreneur généralLedcor Construction Limited Saskatoon Branch
3218D Faithful Avenue Saskatoon Saskatchewan S7K8H3 Canada
Commentaires

New steel building

Horizon Iron Inc. is certified to CSA Standard W47.1 “Certification of companies for fusion welding of steel” in Division 3 and has been sublet the work by Collins Industries Ltd. who is certified in Division 1, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteChad Coakwell
Représentant de la CWBTrevor McFarlane
Date2025-06-12